SGP Site Weekly Coordination Meeting
January 17, 2006, 11:00 am
Central Time
Attending: Dave Breedlove, Don Bond, Dave Groff, Brad Orr, Dan Rusk, Karen
Sonntag, Pete Lamb, Dick Eagan
Not Attending:
Site Operations Status
- Data Availability
- Preliminary
data availability for last week is 94.9%.
- Reports are available on OMIS at: http://www.ops.sgp.arm.gov/
- Outstanding Availability Issues:
- EBBR, MFRSR, SIRS,
SMOS, SWATS:E27 – On 1/12
the SDS log shows the site stopped sending files at 1800 GMT. Missing
data should be recovered.
- MFRSR:E8 – On 1/10
troubleshooting found the sensor failed and was removed from service.
Missing data is not recoverable.
- MWR:C1 – On 1/17 the
computer was locked up and restarted at 1507 GMT. Missing data is not
recoverable.
- RWP50:C1 – Off line
repairs. Missing data is not recoverable.
- SIRS:E18 – The SDS log
shows no files all week. Missing data may be recoverable.
- SWATS:E19 – The SDS
log shows no files all week. Missing data may be recoverable.
- Offline:
- MFRSR: E2, E5, E10, E15, E19, E20, E22
- SWATS: E18
- AERI01: C1
- RWP915: C1, I1
- UVSR: C1
- NIMFR: E13
- MWR: B4
Site Data Quality Status
- I
prepared a report regarding the unusual wildfires in Oklahoma. This
report was sent to the PRB via email. At this point evidence that the
smoke has affected the data is inconclusive. To determine the impact (if any) of
the wildfires on the data will require each mentor to carry out a
detailed investigation.
- Victor
Morris asked me if the CF 25m pyrgeometers have been considered in the
implementation of BCR 1162. A note has been posted in the BCR to alert
the pyrgeometer IM.
SGP SDS Status
- Nothing
Right now.
ECR Status
- Nothing right now.
Site Development Status
- Storage expansion construction continues. Dan Nelson is
monitoring this activity. The storage
expansion building has electricity.
Field Campaigns
- AIRS: The
second phase of AIRS launches begins this week.
- AURA/TES: Francis Schmidlin is interested in
planning ozone launches at the CF.
Ozone launches will begin sometime this week.
- CO2 LIDAR Validation: I have delivered additional meteorological information to
Mike Dobbs concerning January and February precipitation. We are still
awaiting word as to when the ITT campaign will take place. This campaign has been pushed back
to March/April. I will provide them with meteorological information for
that time period.
- HydroKansas: Dan Rusk is still waiting for site
maintenance procedures. Craig Webb, Dan Nelson and others have visited
HydroKansas sites to prepare for stream gauge installations. Craig webb has completed his survey
of the stream gauge sites. At this point it appears that we may need to
manually extract data for some of the locations.
Issues/Other Items/Action Item Review
- Earthstorm
will come to the Central Facility on June 22 for a tour/presentation of
the site. We were contacted by Andrea Medlin. Andrea expects 30-50
teachers to participate.
- David
Groff will work with Rolanda Jundt to create a link for unusual weather events
(i.e. wildfires, snowstorms, severe weather etc.) on the ARM SGP
website.
Next Meeting
The next meeting is scheduled for Tuesday, January 24, 2006, at 11:00 a.m. (CST).
|