SGP Site Weekly Coordination Meeting
January 24, 2006, 11:00 am
Central Time
Attending: Dave Breedlove, Don Bond, Dave Groff, Karen Sonntag, Pete Lamb, Dick
Eagan
Not Attending: Brad Orr, Dan Rusk
Site Operations Status
- Data Availability
- Preliminary
data availability for last week is 97.3%.
- Reports are available on OMIS at: http://www.ops.sgp.arm.gov/
- Outstanding Availability Issues:
- ECOR:E21 - On 1/18 removed
the computer for upgrades and left the instrument off line. Missing
data is not recoverable.
- MFR10, MFRSR:C1/E13 - On 1/19
reset the network hubs at 1621 GMT. Missing data is not recoverable.
- MWR:C1 - On 1/17
found the instrument inoperative and restarted at 1522 GMT. On 1/23
found the instrument inoperative and restarted at 1508 GMT. Missing
data is not recoverable.
- RWP50:C1 - On 1/18
powered off the computer for transmitter repair. Instrument is off
line. Missing data is not recoverable.
- RWP915:I2 - On 1/19
the SDS log shows the site stopped sending files at 1200 GMT. Missing
data may be recovered.
- SIRS:E13 - On 1/20
found the instrument inoperative and restarted at 1507 GMT. Missing
data is not recoverable.
- SIRS:E18 - On 1/17
replaced the hub and bit drivers and restarted collections at 2230 GMT.
Missing data may be recoverable.
- SWATS:E19 - On 1/19
found the instrument inoperative and reloaded the program to start at
1600 GMT. Missing data is not recoverable.
- Offline:
- MFRSR: E2, E5, E8, E10, E15, E19, E20, E22
- SWATS: E18
- AERI01: C1
- RWP915: C1, I1
- UVSR: C1
- NIMFR: E13
- MWR: B4
Site Data Quality Status
- DQPR 711 – Karen and Ken determined that EBBR
AEM at E22 was working properly after the Preventative Maintenance on
1/18. The status has been changed to Pending DQR.
SGP SDS Status
- Nothing
Right now.
ECR Status
- ECR 556 – A web cam will be added to the guest instrument
trailer.
- ECR 557 – A web cam will be added to the 60m tower.
- ECR 555 – Currently, data from the Cimel Sunphotometer are
transmitted to NASA Aeronet for processing via a GOES satellite uplink.
This uplink has proved to be a problem because ARM cannot monitor the
transmissions and cannot readily determine if they have been successful.
Plans are being made to substitute internet data transmission for the
GOES uplink.
- ECR 551 – Plans are being made for the MMCR antennas to be
refurbished. The process will take 2-3 years.
Site Development Status
- Storage expansion is
near completion.
Field Campaigns
- AIRS: The
phase V AIRS launches continue at the CF.
- AURA/TES: Ozonesondes
were launched last week.
- CO2 LIDAR Validation: This campaign has been pushed back to March/April. I have
provided Mike Dobbs with meteorological information for that time
period.
- HydroKansas: Craig webb has completed his
survey of the stream gauge sites. At this point it appears that we may
need to manually extract data for some of the locations.
Issues/Other Items/Action Item Review
- Earthstorm
will come to the Central Facility on June 22 for a tour/presentation of
the site. We were contacted by Andrea Medlin. Andrea expects 30-50
teachers to participate.
- David
Groff will work with Rolanda Jundt to create a link for unusual weather
events (i.e. wildfires, snowstorms, severe weather etc.) on the ARM SGP
website.
Next Meeting
The next meeting is scheduled for Tuesday, January 31, 2006, at 11:00 a.m. (CST).
|