SGP Site Weekly Coordination Meeting
January 31, 2006, 11:00
am Central Time
Attending: Dave Breedlove, Don Bond, Dave Groff, Karen Sonntag, Dan Rusk, Brad
Orr
Not Attending: Pete Lamb
Site Operations Status
- Data Availability
- Preliminary
data availability for last week is 98.3%.
- Reports are available on OMIS at: http://www.ops.sgp.arm.gov/
- Outstanding Availability Issues:
- ECOR:E21 - On 1/26
installed the computer and restarted at 1930 GMT. Missing data is not
recoverable.
- RWP915:IF2 – On 1/25 found
the instrument inoperative and restarted at 2211 GMT. Missing data is
not recoverable.
- RWP915:IF3 – On 1/27
found the computer locked up and restarted at 1700 GMT. Missing data is
not recoverable.
- Offline:
- MFRSR: E2, E5, E8, E10, E15, E19, E20, E22
- SWATS: E18
- AERI01: C1
- RWP915: C1, I1
- UVSR: C1
- NIMFR: E13
- MWR: B4
Site Data Quality Status
- Nothing right now.
SGP SDS Status
- WACR is
now offline and some parts have already been sent.
ECR Status
- Nothing right now.
Site Development Status
- Storage expansion is
near completion.
Instrument Maintenance
1. RWP50 should be up and running in the near future
(next few weeks).
2. RWP915
we are having problems with the amplifier and/or power supply. Vendor will
determine what needs to be done. Because our equipment is obsolete any
maintenance provided by the vendor will be expensive.
Field Campaigns
- AIRS: The
phase II AIRS launches continue at the CF.
- CO2 LIDAR Validation: Still no word from Mike Dobbs.
- PGS:
Continues as scheduled.
- CLASIC:
Will be underway within 16 months.
- HydroKansas: We need to iron out details regarding maintenance expectations.
Issues/Other Items/Action Item Review
- David
Groff will be working with Don Bond to make preparations for SWATS installations.
At this time the ground is too dry for installation.
Next Meeting
The next meeting is scheduled for Tuesday, February 07, 2006, at 11:00 a.m. (CST).
|