SGP Site Weekly Coordination Meeting
February 07, 2006, 11:00
am Central Time
Attending: Dave Breedlove, Dave Groff, Karen Sonntag, Dan Rusk, Brad Orr
Not Attending: Pete Lamb, Dick Eagan
Site Operations Status
- Data Availability
- Preliminary
data availability for last week is 99.3%.
- Reports are available on OMIS at: http://www.ops.sgp.arm.gov/
- Outstanding Availability Issues:
- MFR10:C1 – On 2/2
reset the network hub at 1737 GMT. Missing data is not recoverable.
- MFRSR:E13, C1 - On 2/2
reset the network hub at 1737 GMT. Missing data is not recoverable.
- MWR:C1 – On 2/6 found
the computer locked up and restarted at 1532 GMT. Missing data is not
recoverable.
- MWR:B1 – On 1/30 found
the instrument program locked up and remotely restarted at 1445 GMT.
Missing data is not recoverable.
- NIMFR:E13 – On line
but waiting for ingest and data evaluation from mentor before
activating.
- RWP50:C1 – Off line
for transmitter repair. Missing data is not recoverable.
- RWP915:C1 - On 1/30
installed the phase shifter RF input cable, adjusted the interface
power supply for 32 Vdc, and powered up the system. The interface
current reading was very low. On 1/31 troubleshooting found the 32 volt
power supply had tripped. The vendor requested the interface and final
amplifier units be returned for evaluation. Powered off the instrument
at
2100 GMT. Missing data is not recoverable.
- RWP915:IF1 – Off line
for repair. Missing data is not recoverable.
- Offline:
- MFRSR: E2, E5, E8, E10, E15, E19, E20, E22
- SWATS: E18
- AERI01: C1
- RWP915: C1, I1
- UVSR: C1
- NIMFR: E13
- MWR: B4
Site Data Quality Status
- ECOR:E14
– Latent heat flux and CO2 flux data is missing. I have opened DQPR #718 to account for this issue.
SGP SDS Status
- WACR is
now offline and some parts have already been sent.
ECR Status
- ECR 551 – Kevin Widener
is collecting information to determine the best approach for
refurbishing the MMCR antennas.
- Jimmy will be contacting
Pavlos Kolias to gather information regarding the potential for a
permanent scanning precipitation radar.
Site Development Status
- Storage expansion is near completion.
Instrument Maintenance
1. RWP50 should
be up and running in the near future (next few weeks).
2. RWP915
we are having problems with the amplifier and/or power supply. Vendor will
determine what needs to be done. Because our equipment is obsolete any
maintenance provided by the vendor will be expensive.
Field Campaigns
- AIRS: The
phase II AIRS launches continue at the CF.
- CO2 LIDAR Validation: Still no word from Mike Dobbs.
- PGS: Continues
as scheduled.
- CLASIC: Will
be underway within 16 months.
- HydroKansas: We need to iron out details
regarding maintenance expectations.
Issues/Other Items/Action Item Review
- David
Groff will be working with Don Bond to make preparations for SWATS
installations. At this time the ground is too dry for installation.
Next Meeting
The next meeting is scheduled for Tuesday, February 14, 2005, at 11:00 a.m. (CST).
|