SGP Site Weekly Coordination Meeting
February 14, 2006, 11:00
am Central Time
Attending: Dave Breedlove, Dave Groff, Karen Sonntag, Dan Rusk, Brad Orr, Pete
Lamb
Not Attending: Dick Eagan
Site Operations Status
- Data Availability
- Preliminary
data availability for last week is 99.2%.
- Reports are available on OMIS at: http://www.ops.sgp.arm.gov/
- Outstanding Availability Issues:
- ECOR, SIRS, SMOS,
SWATS:E5 – The SDS log shows the site stopped sending files at 0100
GMT. Missing data should
be recovered.
- MFRSR:E16 – On 2/11
the instrument stopped sending files at 2200 GMT. Missing data may be
recovered.
- MWR:B1 - On 2/8
found the computer powered off and replaced at 1740 GMT. On 2/10 found
the instrument inoperative and remotely restarted at 1406 GMT. Missing
data is not recoverable.
- Offline:
- MFRSR: E2, E5, E8, E10, E15, E19, E20, E22
- SWATS: E18
- AERI01: C1
- RWP915: C1, I1
- UVSR: C1
- NIMFR: E13
- MWR: B4
Site Data Quality Status
- EBBR:E20
– Soil Moisture data for probes 2, 3, 4 and 5 looks suspicious. Will
continue to monitor and discuss with mentor before opening a DQPR.
SGP SDS Status
- Kevin
Widener has developed software to monitor MMCR data collection space.
ECR Status
- Nothing right now.
Site Development Status
- Storage expansion
construction is finished.
Instrument Updates
1. We are switching to global positioning
radiosondes. Vaisala is offering the RS92 GP’s at the same RS92 KL price.
Field Campaigns
- AIRS: The
phase II AIRS launches continue at the CF.
- AURA/TES: Ozonesondes
will be launched along side standard radiosondes.
- CO2 LIDAR Validation: Still no word from Mike Dobbs.
- PGS: Continues
as scheduled.
- CLASIC: Will
be underway within 16 months.
- HydroKansas: We need to iron out details
regarding maintenance expectations. Maintenance
instruction may need to be cut down. Current instructions would require
too much time.
Issues/Other Items/Action Item Review
- Nothing
right now.
Next Meeting
The next meeting is scheduled for Tuesday, February 28, 2006, at 11:00 a.m. (CST).
|