SGP Site Weekly Coordination Meeting
March 14, 2006, 11:00
am Central Time
Attending: Dave Breedlove, Dave Groff, Karen Sonntag, Dan Rusk, Brad Orr, Pete
Lamb, Dick Eagan
Not Attending:
Site Operations Status
- Data Availability
- Preliminary
data availability for last week is 99.1%.
- Reports are available on OMIS at: http://www.ops.sgp.arm.gov/
- Outstanding Availability Issues:
- BRS:C1 - On 3/6
reset communications to the central cluster at 1515 GMT. Missing data
may be recovered.
- EBBR:E8 - On 3/7 found
the instrument inoperative and reloaded the program to correct at 1808
GMT. Missing data is not recoverable.
- MFRSR:E3 – On 3/8
replaced the datalogger at 1820 GMT. The collections are OK but the
ingest is still disabled awaiting TDB update. Missing data should be
recovered.
- MWR:B1 – On 3/9 found
the instrument inoperative and remotely restarted at 1430 GMT. Missing
data is not recoverable.
- TSI:C1 – On 3/6 found
inoperative and restarted at 1537 GMT. Missing data is not recoverable.
- Offline:
- MFRSR: E2, E5, E8, E10, E15, E19, E20, E22
- SWATS: E18
- AERI01: C1
- RWP915: I1
- UVSR: C1
- NIMFR: E13
- MWR: B4
- RWP50: C1
Site Data Quality Status
- Issues
that are highlighted in Data Quality Assessment Reports (DQAR’s) are
accounted for in the DQPR data base.
SGP SDS Status
- Nothing
right now.
ECR Status
- Nothing right now.
Site Development Status
- Nothing right now.
Instrument Updates
1. Nothing right
now.
Field Campaigns
- AIRS: The
phase II AIRS launches continue at the CF.
- CO2 LIDAR Validation: Still no word from Mike Dobbs.
- PGS: A
contract is being worked out to continue PGS.
- CLASIC: Will
be underway within 15 months.
- HydroKansas: Rain gauge calibrations and stream
gauge surveying continues.
- Purcell:
Work will begin in the next week or so to install a magnetometer at
Purcell.
Issues/Other Items/Action Item Review
- Nothing
right now.
Next Meeting
The next meeting is scheduled for Tuesday, March 21, 2006, at 11:00 a.m. (CST).
|