SGP Site Weekly Coordination Meeting
March 21, 2006, 11:00
am Central Time
Attending: Dave Breedlove, Dave Groff, Ken Kehoe, Dan Rusk, Brad Orr, Pete
Lamb, Dick Eagan
Not Attending:
Site Operations Status
- Data Availability
- Preliminary
data availability for last week is 99.7%.
- Reports are available on OMIS at: http://www.ops.sgp.arm.gov/
- Outstanding Availability Issues:
- SIRS:E2 – On 3/15 found
the logger inoperative and cycled the power to restart at 1900 GMT.
Missing data is not recoverable.
- Offline:
- MFRSR: E2, E5, E8, E10, E15, E19, E20, E22
- SWATS: E18
- AERI01: C1
- UVSR: C1
- NIMFR: E13
- MWR: B4
- RWP50: C1
Site Data Quality Status
- THWAPS:B6
– Relative humidity flags tripped on 3/11 from 1140 – 1500 UTC.
SGP SDS Status
- Ron
Reed installed a DSL line at Vici this week.
ECR Status
- ECR 572 – Joe Michalsky will work to establish a diffuse horizontal
shortwave irradiance measurement standard. The ARM standard will be
based on performance during IOP’s.
Site Development Status
- Nothing right now.
Instrument Updates
1. The work
associated with the removal of pyrgeometer calibration bias outlined in BCR
01162 is complete.
Field Campaigns
- AIRS: The
phase II AIRS launches continue at the CF.
- CO2 LIDAR Validation: Still no word from Mike Dobbs.
- PGS: A
contract is being worked out to continue PGS.
- CLASIC: Will
be underway within 15 months.
- HydroKansas: Rain gauge calibrations and stream
gauge surveying continues.
- Magnetic
Field Observations: Work will begin in the next week or so to
install a magnetometer at Purcell.
- SGP Radon
Measurements of Atmospheric Mixing (RAMIX): Radon will be used as a
tracer to measure vertical mixing between the surface layer, boundary
layer, and free troposphere. Concentrations of Radon will be measured
from the 60 m tower. Preparations
for this campaign are underway.
Issues/Other Items/Action Item Review
- Nothing
right now.
Next Meeting
The next meeting is scheduled for Tuesday, April 04, 2006, at 11:00 a.m. (CST).
|